BUILDING LICENSE

H.O LISENCE

BASE ON THE LAW
1. Decree of government muarojambi, num 7,2001 about retribution annoyance license
2. decree of regent muarojambi num 102,2001

UNIT
Region secretarist of Muarojambi in economy unit

PROCEDURAL
The asker fill in the form that served with enclosing the needed requirements

REQUIREMENTS
1. Identity card and identity number of region tax payer ( copied )
2. a receipt of land buildig text ( the last one ). It is adjusted with determined land/usage, if it is industry area ( copied )
3. land certificate or an evidence of land getting ( copied )
4. design of placing order of instalantion, machine, equipments of industry building that have already proved by the head of the asking company or the attornied
5. Agreement from neighbourhood or society surounding
6. the end of production process that is equipped with the list of raw materials / supporting / the last part of waste proessing

TIME
7 ( seven ) days of working days

COST
Considered based on evironment tariff calculation multiplied with the wide of place business multiplied with the location index multiplied with the location index multiplied annoyance index
a. Enviroment tariff
- the wide of business place 1-100 m2 RP. 350/m2
- the wide of business place above 100 m2 Rp 150 /m2
b. Annoyance index tariff
- big annoyance 5
- medium annoyance 3
- small annoyance 2
- free annoyance 1
c. Location Index
- State road : 5
- Province : 4
- Regency : 3
- Village : 2
- Others : 2

VALID ISSUE
3 ( three ) years

THE KEEPER’S OBLIGATION
1. The company must save the enviroment from pilution that is from liquid, solid, gas sound nuisance
2. Company must serve waste processing instalation to minimize the effect into enviroment
3. Company must not throw waste away from processing or derecting activities that can pulute the river and it is a must to buld the shelter or Pond in order to be as a shelter of wasting water that also has function as a filter to netralize hue wastng water or area for solid waste
4. Company must reduce air polution and sound nuisance gas leaking out. The effects of process of industry machine / activities and other equipment
5. Company must save the dangerous chemist material for human life animals and natura surounding it and othe danger so the company must buld a special shelter / pond.
6. Company must keep the clean of environment and away the smell that can distrurb the public health
7. Company must prepare the fire fighter’s equipment such as water hidrant, fire extinguisher, sand ladder etc, these equipments must be put at the reachable place

SANCTION
1. Warning In Written
2. Frozen The Lisence
3. Drawn Out The Lisence
4. Breaking the retibution obligation sentenced 6 month in jail or fined fourfold of debt retribution